You will learn how to properly mix dry pack mortar form the screeds pull the mortar to ensure a consistent pitch or perfectly flat substrate.
John bridge drypack shower floor.
Inches top layer deck mud thickness 1 25 1 50 1 75 2 00 2 25 2 50 inches preslope layer deck mud thickness at wall 0 50 0 75 1 00 1 25 1 50 1 75 2 00 2 25 2 50 inches.
Bridge may 2006 despite everything that s been written on the proper way to make dry pack mortar there still seems to be a great deal of uncertainty on the part of weekend warriors and even a few pros have trouble with the concept.
Ft installed by a plumber over a concrete floor in a new shower installation as i prepared to tile over it i found crumbly spots on the surface and discovered what sounded like hollow spots below the surface near the drain and at the perimeter.
I was thinking of buying that auger where you can mix dry pack in a 5 gal bucket or a 3 5 cu ft barrel type cement mixer.
Despite what you may think water can and will penetrate all the way through the tile mortar and concrete above the shower pan making its way down to the shower pan.
This is a lot of dry pack mud and need to know which is the fastest way to mix all this.
Archive problems with dry pack shower floor tile forum advice board ceramic tile advice forums john bridge ceramic.
Learn how to work with dry pack mortar to float a shower pan.
It is a traditional with a mortar preslope then pvc liner then drypack over the pvc liner.
I recently had a dry pack 20 sq.
I am needing to pour a lot of dry pack on the pre slope of a shower floor which is 60 x92.
But the article and pictures in john bridge s tile your world book show the bench built on top of the pvc liner before the final layer of floor is poured.
Making deck mud dry pack mortar for tiled shower floors and other uses john p.
I have been slowly constucting a shower using info from searching this forum.
The site has a two pronged mission.
I wanted to work on top of the floor instead of the liner so that.
Want to lock the bed in tight and strong with no grit residue the nxt day saturate the wire lathe prior to dumping your dry pack it also keeps the mud very workable after screeding a section i follow up with wood float to sand out high spots then final with steel trowel to a fine finish a step some guys.